Multi-Purpose Maintenance:
This page aims to summarize the ongoing discussion about the maintenance of the multi purpose room at Oak school.
Click here for the Frequently Asked Questions (FAQ) and below is a description of the recommended phases including costs.
| 1. |
Walls |
|
|
| |
paint |
$5,000 |
|
wallcovering |
$10,000 |
| 2. |
Floor |
|
|
|
carpet |
$5,000 |
|
vinyl tile |
$7,000 - 10,000 |
| 3. |
Student Display Boards |
$3,000 |
4. |
Interior Door (access from multi to annex) |
$1,000 |
5. |
Plumbing line to Annex (for possible hot lunch area in annex) |
$1,800 |
| 6. |
Interior wall w/door in annex - (to separate storage area from hot lunch area) |
$1,800 |
| 7. |
Finish walls and floor in hot lunch area of annex |
$2,500 |
| 8. |
Sink in Annex |
$800 |
| 9. |
Water Heater in Annex |
$1,100 |
| 10. |
Built-in cabinets in Multi |
Private Donor |
| 11. |
Stage |
|
|
built-in stage with storage below for chairs and tables. (price includes raising ceiling above stage) |
$8,000 |
|
portable stage |
$7,000 |
|